OWCON ARB1 Automatic Warehouse Project

Projects - 07/10/2024

REDUCED 50% HANDLING COST WITH OWTEK VERSION 1 AUTOMATED SPREADING SYSTEM

PROJECT NAME: IMPORT – SPREADING CONVEYOR SYSTEM – VINH HOAN 2 FOOD COMPANY LIMITED

ACHIEVEMENTS:

  • Reduced handling costs by 50% compared to using trucks and loaders.
  • Increased handling productivity by 60% compared to the old method.
  • Eliminated the issue of broken paddy grains during transportation, minimizing product loss.

PROJECT REQUIREMENTS:

  • Design a system that can transport products from outside into the warehouse, and distribute products into individual compartments as required by the customer.
  • Minimum required capacity: 40 tons/hour.